HONESTY / INTEGRITY / QUALITY
Project consists of the preliminary grading of an industrial use pad, roadway construction, storm water management
construction, and watermain installation. Mass Grading
The Base Bid scope of work for the Curbside Exterior Improvements includes:
Installation of new metal wall and soffit panels on the exterior of the Terminal building
Painting exterior wall surfaces and columns
Removal and relocation of windows
New exterior lighting fixtures
New signage
Installation of bollards, permanent benches, and waste receptacles
Removal of brick walkway and installation of concrete sidewalk.
Water line extension project on Browning Lambert Mountain area consisting of 20,700 feet of 8", 6", 4", and 2" water mains, 1 pressure reducing station, fire hydrants, gate valves, water meter installations and other related work.
Construction of 29,500 feet of 8", 6", 4", and 2" water mains, 1 pressure reducing station, fire hydrants, gate valves, water service lines, water meter installation and other related work.
Falls Mills Sewer Rehabilitation and Replacement for the Tazewell County Public
Service Authority, which consists of the rehabilitation of approximately 180 manholes and 2 sanitary sewer lift stations along with all related appurtenances
Construction of Cell 5 (approximately 7.7 acres) at its Permit 605 landfill. The work
consists of installation of all erosion and sediment control measures, preparation (filling and
excavation) of the subgrade, rock removal, installation of 12” controlled subgrade, liner
placement including geosynthetic clay liner and 60 mil HDPE liner system, geotextile, gravel
drainage layer; leachate collection piping, gravity piping, tank with concrete pad, pumping
system and force main; stormwater channels; and the development of a soil borrow area.
WVDOH District 10 Tony Fork Bridge Repair
WVDOH District 10 Havaco Salt Shed


